Clear Model – 100% owned AML Walford Creek Project. 2017 drilling determined refined geological model – Zambian Copperbelt Style Geological Model New higher grade 2018 Resource estimates underpinned by advanced geological and economic development parameters 2018 drill campaign forecast to commence in April utilising 3 rigs to drill at least 30,000m to; advance the known mineralisation to development status; AND test the +20kms of potential extension of the current Resources 2018 estimates include total of 262 holes (Aeon and historical), mainly diamond core, for +42,000m and 29,242 assays Associated metallurgical parameters and 2018 testwork aligned with primary production of copper and cobalt. Concentrator to produce a copper concentrate (and possible zinc concentrate) Roaster to produce cobalt oxide Latest News. READ MORE Exploration Upside. Mineralisation is both structurally and lithologically controlled – Fish River Fault (FRF) and Pyrite Units (PY1 and PY3) Current JORC Resource defined along 3.6km strike length of the FRF zone FRF Zone (including Resource) extends for +20km within the Walford Creek Project tenements Walford Creek. READ MORE Clear Future. Extend project development: Inclusion of high grade PY3 tonnes Metallurgical flowsheet associated with revised Resource. 2018 testwork underway with 1.6t of material Seismic survey to assist drill targeting over +18km along strike of Resource Infill and expansion (along strike) drilling – 30,000m commencing April 2018.