Clear Model –
100% owned AML
Walford Creek Project.

 


2017 drilling
determined refined
geological model –
Zambian Copperbelt
Style Geological Model

New higher grade 2018
Resource estimates
underpinned by
advanced geological
and economic
development
parameters

  • 2018 drill campaign forecast to commence in April utilising 3 rigs to drill at least 30,000m to;
    • advance the known mineralisation to development status; AND
    • test the +20kms of potential extension of the current Resources
  • 2018 estimates include total of 262 holes (Aeon and historical), mainly diamond core, for +42,000m and 29,242 assays
  • Associated metallurgical parameters and 2018 testwork aligned with primary production of copper and cobalt.
    • Concentrator to produce a copper concentrate (and possible zinc concentrate)
    • Roaster to produce cobalt oxide

Latest
News.


Exploration Upside.


  • Mineralisation is both structurally and lithologically controlled – Fish River Fault (FRF)  and Pyrite Units (PY1 and PY3)
  • Current JORC Resource defined along 3.6km strike length of the FRF zone
  • FRF Zone (including Resource) extends for +20km within the Walford Creek Project tenements

Walford
Creek.


Clear Future.


Extend project development:

  • Inclusion of high grade PY3 tonnes
  • Metallurgical flowsheet associated with revised Resource. 2018 testwork underway with 1.6t  of material
  • Seismic survey to assist drill targeting over +18km along strike of Resource
  • Infill and expansion (along strike) drilling – 30,000m commencing April 2018.